新建徐州至淮安至盐城铁路站前工程XYZQ-Ⅳ标段位于宿迁市境内,起于宿迁市宿城区,至于宿迁市泗阳县,正线长度44.104km,特大桥2座,全长39023.73m。文章主要介绍富水区粉砂土地质钻孔桩装配式钢结构泥浆池设计施工技术。工程概况工程简介新建徐州至淮安至盐城铁路站前工程施工总价承包XYZQ-Ⅳ标段起止里程桩
The project XYZQ-Ⅳ of the former Xuzhou-Huaian-Yancheng Railway Station project is located in Suqian City and starts from Sucheng District in Suqian City. As for Siyang County, Suqian City, the main line has a length of 44.104km and two super-large bridges with a total length of 39023.73m. This article mainly introduces the design and construction technology of the mud pool of the assembled steel structure of the geological bored piles in silty sand in the water-rich area. Project Overview Project Introduction Xuzhou to Huaian to Yancheng Railway Station in front of the project construction contract price XYZQ-Ⅳ bidders starting and ending mileage pile