论文部分内容阅读
通过爆破能量释放式机站和风墙的研究与试验 ,保证了距离采场较近的机站的安全并较好的利用了机站的压头 ,为多级机站通风系统采场的Ⅰ级站设计提供了一种新的形式。
Through the blasting of energy release station and wind wall research and test to ensure the safety of the station near the stope and make better use of the station pressure head for the multi-station ventilation system stope Ⅰ level Station Design provides a new form.