四月下旬,我局在新安江第七列车电站召开了集中控制技术经验交流现场会议。在这次会义中,有部、技改局、各地中试所、部分省(市)电业局的工程技术人员和我局各站代表一百余人参加。讨论了关于集中控制的“范围”、“布置”和“元件”等项目。参观了现场设备、试验了元件性能。第七列车电站改装集控工作起了会诊作用。我参加了这次会义,丰富了我的技术知识,现谨将我体会的几点归纳为以下几个问题,供大家探讨,如有不正确之处,请指正。
In late April, the SIPO held an on-site meeting on the centralized control technology experience exchange at the No. 7 train station in Xin’anjiang. In this session, more than one hundred people from engineering and technical personnel of the ministry, technical reform bureaus, local pilots, and provincial (city) electric power bureaus attended the conference. Discusses items such as “range”, “layout”, and “components” for centralized control. Visited the field equipment and tested the performance of the components. The seventh train power station reconstruction centralized control work has played the role of consultation. I participated in this meeting and enriched my technical knowledge. Now I would like to summarize several points I have learned for the following issues for you to discuss. If anything is wrong, please correct me.