目前,成昆铁路扩能改造工程成都至峨眉段建设进入到攻坚阶段,架梁、站改、路基等工程在紧张进行施工,一些控制性工程节点目标已实现。该工程全长131 km,设计时速160 km,于2013年底开工建设,预计年底开通投用。
At present, the construction of Chengdu-Emei section of Chengdu-Kunming Railway Expansion and Reconstruction Project has reached a crucial stage. Construction projects such as girder construction, station modification and roadbed construction are under intense construction. The objectives of some controlled engineering projects have been achieved. The project, with a total length of 131 km and a design speed of 160 km, started construction at the end of 2013 and is expected to be put into operation by the end of the year.