论文部分内容阅读
水利水电工程大多采取常年连续高强度浇筑混凝土的施工方案 ,高温季节浇筑大体积混凝土是工程施工中一项系统性技术难题。工程设计上往往要求限制搅拌楼出机口混凝土的温度 ,这对搅拌楼的设计提出了更高的要求。一般来讲 ,承担水利水电主体工程混凝土生产的搅拌楼生产能力应在2
Most of water conservancy and hydropower projects to take perennial continuous high strength pouring concrete construction program, pouring large volume concrete in high temperature season is a systematic engineering technical problems. Engineering design often require the mixing station to limit the temperature of the concrete out of the mouth, which stirred the design of the proposed higher requirements. In general, the main production of water conservancy and hydropower concrete mixing plant production capacity should be 2