摘要:市场经济的飞速发展令我国路桥工程建设规模日益扩充,其承担着疏导交通、畅通连接的重要职能。伴随城市交通压力的逐步增大,路桥工程在服务使用进程中也日益暴露了较多显著问题,因此本文就路桥工程科学施工要点及综合管理展开探讨,对提升工程施工建设水平,延长服务使用寿命,发挥良好的应用效益有积极有效的促进作用。
关键词:路桥工程;施工;技术;管理
Abstract: the rapid development of market economy to road and bridge engineering construction scale in our country is increasingly expanded, the bear the key function of the traffic, smooth connection. Along with the increasing urban traffic pressure, road and bridge engineering in the process of service is increasingly exposed the problem is more significant, therefore in this paper, the bridge engineering science construction points, and also discussing integrated management, to enhance the level of engineering construction and prolong the service life of service, to play a good application effects have a positive and effective role in promoting.
Key words: road and bridge engineering, Construction; Technology; management
中途分类号:[TU997] 文献标识码:A
在路桥工程项目当中,做好前期的準备工作会对整个工程施工产生重要的作用,首先需要把施工现场的杂物清理干净,平整场地,铺设施工过程中需要使用的各项设备,尽量避免环境污染,以节约利用资源为主要原则,避免出现占用农田的现象,将施工作为核心的工作内容。在工程开工之前需要确保水、电设施都已经配备齐全,为了保证施工过程中的安全,应该将电力线进行架空铺设,避免妨碍到各种机械设备的正常运行。如果电力线一定要跨越施工现场,则需要计算机械设备的净高度,并且安排电工工作人员对电路进行固定的检修巡查。为了保证施工桩位的准确程度达到施工要求,应该要求两个以上的站点同时进行桩位放样工作,并且安排测量人员对导线点进行复查,进一步加密导线点,完成导线网的铺设,并且按照工程设计图纸找出地面的标高,在经过业主的检查确认之后才可以开始后续的施工作业。
一、前期准备工作
路桥工程施工前期的准备工作尤为重要,首先应将现场杂物进行消除清理、平整夯实,做好机械设备铺设工作,应以杜绝环境污染、节约资源为原则,尽量少占用农田,并以施工为重。在开工之前应做到用水、用电配备到位,为确保安全施工电力线应架空铺设,不得妨碍机械设备正常施工运行。倘若需要跨越施工场地则应计算可通过施工机械净高,配备电工专业人员进行电路检修巡查。为校核各个施工桩位的良好准确性,应确保两个及以上站点进行桩位的同时放样,测量人员则应做好前期施工导线点的检查复测,将导线点加密,在桥梁工程四周构成附合导线网并依据图纸放出地面标高与桩基中心桩位,履行业主检查测量合格之后才可进行后续施工。
二、基坑处理过程中应该注意的施工要点
在进行路基的填筑工作之前需要采用铺设土工格栅或者土工布等方法进行前期的处理,然后才可以进行路基的填筑。在填筑过程中采取水平方向上的分层和纵向上的分段。膨胀土在施工的过程中应该根据施工现场的自然气候条件,选择合适的机械设备,进行分段流水施工作业。确定合适的作业区域,按照施工工序逐步推进,并且加强监控测量工作。要求分段工作和封闭工作以最快的速度完成,加强防护以及防排水等措施。
在进行路堑施工之前需要做好堑顶截以及相应的排水措施。要求在开挖区域内确保排水系统能够保持畅通,并且确保边坡的稳定性。路堑石方在施工的过程中采用的主要技术为浅孔和梯级,要求在堑坡面预留厚度为 0. 3 m 的整修层,爆破要求能够达到设计规定的位置,然后进行纵向上的分段和水平方向上的分层。在进行开挖之前,需要对施工场地的现场地质、水文情况进行测量以及调查工作,确定爆破梯段的具体高度、钻孔的具体布置位置以及施工段的长度等,获取相关参数,确认起爆的顺序,在将上述内容报批之后还需要进行试爆破,将爆破过程中的参数进一步修改和完善,在实际的施工过程中,应该按照地质情况的变化及时的对爆破设计进行修改。在边坡开挖之后对于没有采取防护措施的部位应该及时的采取措施覆盖,避免雨水将拉槽破坏掉。
三、路桥工程混凝土施工中需要注意的施工要点
在混凝土的施工环节中通常会涉及到很多施工工艺以及技术,所以一定要对其中的要点环节投入足够的重视。首先应该根据一定的厚度以及顺序等进行分层浇筑工作,先浇筑上层硅,并且要求在高处把硅进行直接的倾卸,要注意将自由倾落的高度控制在 2 m 以下,如果超出了 2 m 则需要借助硫管等设施进行处理,之后才可以完成下层混凝土的初凝。
在完成浇筑工作之后,应该及时的做好覆盖措施,并做好养护工作,避免混凝土在遭受到阳光的暴晒之后出现裂缝,养护环节应该安排专门的人员,保证养护时间大于 7 d。在对现浇板进行整体的浇筑过程中,一定要严格的遵守相关的规定,从两端的梁段开始浇筑逐渐过渡到墩顶的位置,最后再对现浇板两端 3 m 范围内的梁段进行混凝土浇筑。要注意在混凝土浇筑的过程中严格的控制内外温度的差异,避免受到水化热的不良影响,避免混凝土表面出现裂缝。在进行路桥工程立柱以及台墩的施工过程中,钢筋的连接可以通过搭接电弧来进行,要将双面焊缝的长度控制在钢筋直径的五倍以内,将单面焊缝的长度控制在钢筋直径的 10 倍以内,最后把焊渣清理干净,把钢筋的连接位置控制在同一个轴线上面。在使用钢筋之前需要将表面上的锈色以及漆皮等清理干净,在完成钢筋的安装之后需要对其细致的检查,经过监理单位的审批之后才可以开始立柱跟台墩的施工工序。
四、路桥工程质量管理与控制
4.1 路桥工程全过程质量管理
路桥工程质量控制管理尤为重要,各级领导应科学树立质量控制观念意识,开展科学施工技术策略培训,带动企业全员抓质量、强化控制。在施工过程中应由人员、组织与制度三类层面共同抓起,创建质保体系,为质量管理控制提供优质决策保证。针对各类常见质量通病应制定完善控制质量措施,为质保体系良好运行提供有力保障。同时还应健全建立质量管理自检措施,对于没有通过检测的不合格施工杜绝其进入下道工序。项目部门应履行不定期与定期安检制度并对检查的每次结果进行通报发布,令其同奖惩措施全面挂钩。做到互检、班组自检、工序检查与专项检验的统筹结合,重点检验关键工序并设立专管质量人员。
4.2 科学实施路桥工程成本管理控制
为优化成本管理控制效果,路桥工程施工建设单位首先应由施工工序、工艺层面强化成本控制,提升作业层综合管理力度,结合路桥工程项目实际状况合理组织施工人员队伍、班组提出优化改进施工方案建议,全面调动员工积极性进而提升劳动工作效率,实现降低成本、保证工期的科学目标。路桥工程施工进程中应良好处理进度控制、质量控制与成本控制间的关系,事实上三者是相互影响、相互制约的统一体,任意目标的更新变化均会令其他两个目标产生变化并受到制约影响。因此应科学强化路桥工程的整体质量检验,有效杜绝桥梁工程发生质量事故,对施工计划进度应合理安排,科学平衡各项生产环节,进而确保施工工期的顺利进行,有效降低成本投入。
结束语
针对路桥施工技术与质量控制对企业的重要性,施工企业还应加强自身技术力量的培训与培养,加强相关技术人员的培训工作,以此促进企业施工技术与质量控制工作的实施,提高管理水平。在实际施工技术管理与质量监控过程中,施工企业不仅要做好混凝土技术管理工作,同时还要做好路桥工程施工准备阶段的技术、人力、材料、施工机械的准备工作,以及施工后的混凝土养护和修补工作,确保路桥工程具有较高施工质量水平,为城市树立良好的形象,同时为城市居民提供便捷快速的出行交通基础设施。
参考文献
[1] 刘红 .浅谈路桥工程的质量控制监督[J].决策与信息 ,2011(3).
[2] 黄光必.路桥工程现场施工中创优要点探讨分析[J].科技创业家,2011(8).
[3] 苏荣荣.浅析我国路桥施工项目的管理问题[J].中国高新技术企业,2009,(7).
关键词:路桥工程;施工;技术;管理
Abstract: the rapid development of market economy to road and bridge engineering construction scale in our country is increasingly expanded, the bear the key function of the traffic, smooth connection. Along with the increasing urban traffic pressure, road and bridge engineering in the process of service is increasingly exposed the problem is more significant, therefore in this paper, the bridge engineering science construction points, and also discussing integrated management, to enhance the level of engineering construction and prolong the service life of service, to play a good application effects have a positive and effective role in promoting.
Key words: road and bridge engineering, Construction; Technology; management
中途分类号:[TU997] 文献标识码:A
在路桥工程项目当中,做好前期的準备工作会对整个工程施工产生重要的作用,首先需要把施工现场的杂物清理干净,平整场地,铺设施工过程中需要使用的各项设备,尽量避免环境污染,以节约利用资源为主要原则,避免出现占用农田的现象,将施工作为核心的工作内容。在工程开工之前需要确保水、电设施都已经配备齐全,为了保证施工过程中的安全,应该将电力线进行架空铺设,避免妨碍到各种机械设备的正常运行。如果电力线一定要跨越施工现场,则需要计算机械设备的净高度,并且安排电工工作人员对电路进行固定的检修巡查。为了保证施工桩位的准确程度达到施工要求,应该要求两个以上的站点同时进行桩位放样工作,并且安排测量人员对导线点进行复查,进一步加密导线点,完成导线网的铺设,并且按照工程设计图纸找出地面的标高,在经过业主的检查确认之后才可以开始后续的施工作业。
一、前期准备工作
路桥工程施工前期的准备工作尤为重要,首先应将现场杂物进行消除清理、平整夯实,做好机械设备铺设工作,应以杜绝环境污染、节约资源为原则,尽量少占用农田,并以施工为重。在开工之前应做到用水、用电配备到位,为确保安全施工电力线应架空铺设,不得妨碍机械设备正常施工运行。倘若需要跨越施工场地则应计算可通过施工机械净高,配备电工专业人员进行电路检修巡查。为校核各个施工桩位的良好准确性,应确保两个及以上站点进行桩位的同时放样,测量人员则应做好前期施工导线点的检查复测,将导线点加密,在桥梁工程四周构成附合导线网并依据图纸放出地面标高与桩基中心桩位,履行业主检查测量合格之后才可进行后续施工。
二、基坑处理过程中应该注意的施工要点
在进行路基的填筑工作之前需要采用铺设土工格栅或者土工布等方法进行前期的处理,然后才可以进行路基的填筑。在填筑过程中采取水平方向上的分层和纵向上的分段。膨胀土在施工的过程中应该根据施工现场的自然气候条件,选择合适的机械设备,进行分段流水施工作业。确定合适的作业区域,按照施工工序逐步推进,并且加强监控测量工作。要求分段工作和封闭工作以最快的速度完成,加强防护以及防排水等措施。
在进行路堑施工之前需要做好堑顶截以及相应的排水措施。要求在开挖区域内确保排水系统能够保持畅通,并且确保边坡的稳定性。路堑石方在施工的过程中采用的主要技术为浅孔和梯级,要求在堑坡面预留厚度为 0. 3 m 的整修层,爆破要求能够达到设计规定的位置,然后进行纵向上的分段和水平方向上的分层。在进行开挖之前,需要对施工场地的现场地质、水文情况进行测量以及调查工作,确定爆破梯段的具体高度、钻孔的具体布置位置以及施工段的长度等,获取相关参数,确认起爆的顺序,在将上述内容报批之后还需要进行试爆破,将爆破过程中的参数进一步修改和完善,在实际的施工过程中,应该按照地质情况的变化及时的对爆破设计进行修改。在边坡开挖之后对于没有采取防护措施的部位应该及时的采取措施覆盖,避免雨水将拉槽破坏掉。
三、路桥工程混凝土施工中需要注意的施工要点
在混凝土的施工环节中通常会涉及到很多施工工艺以及技术,所以一定要对其中的要点环节投入足够的重视。首先应该根据一定的厚度以及顺序等进行分层浇筑工作,先浇筑上层硅,并且要求在高处把硅进行直接的倾卸,要注意将自由倾落的高度控制在 2 m 以下,如果超出了 2 m 则需要借助硫管等设施进行处理,之后才可以完成下层混凝土的初凝。
在完成浇筑工作之后,应该及时的做好覆盖措施,并做好养护工作,避免混凝土在遭受到阳光的暴晒之后出现裂缝,养护环节应该安排专门的人员,保证养护时间大于 7 d。在对现浇板进行整体的浇筑过程中,一定要严格的遵守相关的规定,从两端的梁段开始浇筑逐渐过渡到墩顶的位置,最后再对现浇板两端 3 m 范围内的梁段进行混凝土浇筑。要注意在混凝土浇筑的过程中严格的控制内外温度的差异,避免受到水化热的不良影响,避免混凝土表面出现裂缝。在进行路桥工程立柱以及台墩的施工过程中,钢筋的连接可以通过搭接电弧来进行,要将双面焊缝的长度控制在钢筋直径的五倍以内,将单面焊缝的长度控制在钢筋直径的 10 倍以内,最后把焊渣清理干净,把钢筋的连接位置控制在同一个轴线上面。在使用钢筋之前需要将表面上的锈色以及漆皮等清理干净,在完成钢筋的安装之后需要对其细致的检查,经过监理单位的审批之后才可以开始立柱跟台墩的施工工序。
四、路桥工程质量管理与控制
4.1 路桥工程全过程质量管理
路桥工程质量控制管理尤为重要,各级领导应科学树立质量控制观念意识,开展科学施工技术策略培训,带动企业全员抓质量、强化控制。在施工过程中应由人员、组织与制度三类层面共同抓起,创建质保体系,为质量管理控制提供优质决策保证。针对各类常见质量通病应制定完善控制质量措施,为质保体系良好运行提供有力保障。同时还应健全建立质量管理自检措施,对于没有通过检测的不合格施工杜绝其进入下道工序。项目部门应履行不定期与定期安检制度并对检查的每次结果进行通报发布,令其同奖惩措施全面挂钩。做到互检、班组自检、工序检查与专项检验的统筹结合,重点检验关键工序并设立专管质量人员。
4.2 科学实施路桥工程成本管理控制
为优化成本管理控制效果,路桥工程施工建设单位首先应由施工工序、工艺层面强化成本控制,提升作业层综合管理力度,结合路桥工程项目实际状况合理组织施工人员队伍、班组提出优化改进施工方案建议,全面调动员工积极性进而提升劳动工作效率,实现降低成本、保证工期的科学目标。路桥工程施工进程中应良好处理进度控制、质量控制与成本控制间的关系,事实上三者是相互影响、相互制约的统一体,任意目标的更新变化均会令其他两个目标产生变化并受到制约影响。因此应科学强化路桥工程的整体质量检验,有效杜绝桥梁工程发生质量事故,对施工计划进度应合理安排,科学平衡各项生产环节,进而确保施工工期的顺利进行,有效降低成本投入。
结束语
针对路桥施工技术与质量控制对企业的重要性,施工企业还应加强自身技术力量的培训与培养,加强相关技术人员的培训工作,以此促进企业施工技术与质量控制工作的实施,提高管理水平。在实际施工技术管理与质量监控过程中,施工企业不仅要做好混凝土技术管理工作,同时还要做好路桥工程施工准备阶段的技术、人力、材料、施工机械的准备工作,以及施工后的混凝土养护和修补工作,确保路桥工程具有较高施工质量水平,为城市树立良好的形象,同时为城市居民提供便捷快速的出行交通基础设施。