渭南二跨渭河特大桥河工模型试验研究

来源 :中国水运(理论版) | 被引量 : 0次 | 上传用户:wufala
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
拟建的渭南二跨渭河特大桥位于过渡型河段,该河段河身宽浅,滩地宽广,河床易冲易淤,且上下游7.25km范围内已建和在建的桥梁有:沙王渭河大桥、关中公路环线渭河特大桥、渭蒲公路渭河大桥、渭南上涨渡渭河大桥,在该河段组成桥群。为研究大桥修建后,大桥及桥群对桥位河段的影响问题,开展桥位河段模型试验。模拟分析拟建大桥建成后,桥位河段河势演变趋势,桥渡壅水情况,上下游河段的冲淤演变情况和对河道行洪等方面的影响,是渭南二跨渭河特大桥修建成功与否及健康运行的关键所在。 The proposed Weinan two-span Weihe River Super-Large Bridge is located in the transitional section of the river. The section of the river is wide and shallow, the beach is broad, and the river beds are easily silted. The bridges under construction and under construction in the upper and lower reaches of 7.25km include sand Wang Wei River Bridge, Guanzhong Highway Ring Weihe River Bridge, Wei Po Highway Weihe River Bridge, Weinan crossing Weihe River Bridge, in the reach of the bridge group. In order to study the impact of the bridge and bridge group on the bridge section after the construction of the bridge, the bridge section model test was carried out. After the completion of the proposed bridge, the trend of the river regime in the bridge section, the situation of the bridge crossing water, the evolution of the scouring and silting in the upstream and downstream reachs and the impact on the flood discharge of the river are simulated and constructed. Success or failure and healthy operation of the key.
其他文献
企业进行ISO9000认证,在建立质量管理体系时,可以由企业自己去做,也可以请咨询机构或咨询人员帮助,这完全由企业自己来决定选择,目前绝大多数企业是选择请咨询机构或咨询人员
介绍了一种利用工控机和IPC5375接口卡,对步进电机实现高精度定位和速度控制的方案.文中介绍了步进电机、IPC5375接口卡、Labwindows/CVI等硬软件,较详细地讨论了步进电机的
化工生产的前提是能够保证生产过程的安全性,但由于化工生产涉及到各种易燃易爆、有毒有害的气体或者物质,并且整个操作流程要求十分严格,操作不当带来的后果较为严重,因此,
不bù知zhī道dào是shì真zhēn是shì假jiǎ,  说shuō是shì夜yè里lǐ,  仙xiān人rén把bǎ礼lǐ物wù放fànɡ进jìn毛máo袜wà;  不bù知zhī道dào是shì真zhēn是shì假jiǎ,  说shuō是shì过ɡuò节jié,  仙xiān人rén把bǎ玩wán具jù放fànɡ在zài好hǎo孩hái子zi的de枕zhěn头tou底dǐ下xià。  我w
期刊
一个好行为会养成好习惯,一个好习惯会养成好性格,一个好性格会成就你的优秀人生……细节决定成败--关注细节,让人生的起点更优秀!