举世瞩目的三峡工程已于2010年10月26日首次蓄水到设计正常水位175m高程,并连续三年达到蓄水175m目标,这标志着三峡工程各项功能都达到了设计要求。三峡工程是优质工程,本文不拟涉及其工程全部,只试图根据亲历亲闻,介绍三峡混凝土大坝(包括左、右岸地面厂房)的卓越的筑坝实践。
The Three Gorges project, which attracted worldwide attention, first impounded water to a designed normal water level of 175m on October 26, 2010 and reached a target of 175m impoundment for three consecutive years. This indicates that all the functions of the Three Gorges Project have met the design requirements. The Three Gorges Project is a high-quality project. This article does not intend to cover all of its works. It attempts to introduce the excellent dam-building practice of the Three Gorges concrete dam (including the left and right ground plants) based on personal experiences.