论文部分内容阅读
随着高速铁路的发展,对路基工后沉降要求越来越高,通过工程实例,介绍铁路湿陷性黄土路基基底处理措施。
With the development of high-speed railway, the requirements for post-construction settlement of subgrade are getting higher and higher. Through engineering examples, the paper introduces the treatment measures of railway collapsible loess subgrade.