论文部分内容阅读
介绍了新建空分设备的循环水系统使用前初次水质处理的3个步骤:杀菌剥离、清洗和预膜,结合处理过程中监测到的水质参数,评价了初次水质处理的效果。
The three steps of initial water quality treatment before the recirculating water system of the new air separation plant are introduced are as follows: sterilization, stripping, cleaning and prefiltration. The water quality parameters monitored during the treatment are evaluated to evaluate the effect of the initial water quality treatment.