摘要:任何建筑都必须有一个好的基础,对大型高层、超高层建筑来讲,这点尤为重要。随着城市建设中高层、超高层建筑的大量涌现,深基坑工程越来越多。因此,深基坑支护引起了各方面的广泛重视。本文以土钉墙支护为例重点探讨了施工要点并提出一些深基坑支护施工建议以供同行参考交流。
关键词:高层;深基坑支护;施工要点;建议
Abstract: any building must have a good foundation, for large high-rise, super high-rise buildings, which is particularly important. With the emergence of a large number of city construction of tall and super high-rise buildings, more and more deep excavation. Therefore,deep foundation pit supporting attracted wide attention in all aspects. In this paper, soil nailing wall for examplediscusses the key points of construction and put forward some deep foundation pit construction proposal for reference exchange.
Keywords: high; deep foundation pit; construction;suggestion
中图分类号: TV551.4 文献标识码:A文章编号:2095-2104(2013)
深基坑施工是地下工程施工富于变化而又复杂的环节,其中深基坑支护施工是保证整个地下施工过程中基坑的安全,同时又要控制因开挖而引起的支护结构和周围土体的变形,以便保护周围环境(如相邻建筑及地下公共设施等)的重要组成部分。如果处理得不好对工程所带来的损失是不可估量的。本文就以土钉墙施工为例,探讨深基坑施工的要点。
1.深基坑施工要点
土钉墙施工工艺流程为:开挖基坑工作面、修整边坡→设置土钉或锚杆(包括成孔、置入钢筋、注浆、补浆)→铺设、固定钢筋网→喷射混凝土面层。
1)开挖土方。基坑要按设计要求严格分层分段开挖,在完成上一作业面土钉与喷射混凝土面层达到设计强度的70%以前,不得进行下一层土层的开挖(允许在距离四周边坡8~10m的基坑中部自由开挖)。当用机械进行土方作业时,超挖深度不得大于0.5m,边坡宜用小型机具或铲进行切削清坡,以保证符合设计边坡要求。对自稳能力差的土体,如高含水量的黏性土和无粘接力的砂土,可先进行喷射混凝土面层施工。
2)成孔施工。采用洛阳铲人工成孔,钻孔前定位:根据设计要求定出孔位,做出标记。钻孔采用回转钻进方式,钻进时采用清水循环护孔,反复循环,对孔口流出的泥浆不断清除残渣。在填土层地段应加大泥浆比重,以防塌孔。钻孔后应反复用泥浆循清孔,以清除孔内泥渣等残留物,成孔后应及时安置土钉钢筋并注浆。
3)土钉钢筋。土钉制作由钢筋班根据设计图纸要求在加工场进行。钢筋调直采用冷拉方法,钢筋的截断采用切割机,钢筋弯曲采用机械方法,依据设计要求进行加工成型。钢筋的纵向连接采用焊接,焊接处应置于钻孔深部。要按设计要求采用的钢筋的级别、钢号、直径分类堆放。钢材要有出厂质量证明书。验收内容:对标牌、外观进行检查并进行机械性能测试。钢筋焊接前必须根据施工条件进行试焊,合格后方可施焊。焊工必须持有上岗证,并须试焊合格。电焊条应具有合格证,钢筋在加工过程中如发现脆性断裂、焊接性能不良,显著的不正常现象应进行化学成分分析试验。钢筋在使用前要调直,制作钢筋须搭架并要求架体水平,土钉钢筋的主筋采用焊接,单面焊焊缝长度10d,双面焊5d。钢筋制作好后,经当班质检员与监理验收合格后,方可下入孔内。
4)注浆。水泥砂浆采用砂浆搅拌机,根据砂浆配合比试验参数进行砂浆搅拌,砂子必须过筛。根据设计要求数量,及时制作砂浆试样,认真养护,达到龄期后,在监理工程师监督下送指定实验站进行检验。注浆采用压力注浆机,注浆前应将孔内残留或松动的杂土清除干净,注浆时,注浆管应插至距孔底250~500mm处,孔口部位设置止浆塞。通过下入孔底的注浆管,一次完成注浆,注浆前必须用清水润滑管路,待砂浆溢出孔口后,一边注浆一边拔管直至注浆管全部拔出,及时冲洗注浆管路,结束注浆。二次补浆在一次注浆结束2h后进行,二次补浆必须将土钉孔完全注满方可结束。土钉钢筋置入孔中前,应先人工清孔并设置定位支架,保证钢筋处于钻孔的中心部位。
5)绑扎钢筋网。按设计要求绑扎、固定钢筋网。钢筋网片采用绑扎而成,铺设钢筋网时每边的搭接长度不应小于200mm。土钉与面层连接可用与土钉钢筋同直径的短钢筋头焊接牢固。喷射混凝土时钢筋网不得晃动。
6)喷射混凝土施工。采用分段分片依次进行,同一分段内喷射顺序自下而上,一次喷射厚度为30mm。喷射时,喷头与受喷面应垂直,保持600--1000mm的距离;施工过程中要控制好水灰比,保持混凝土表面平整、湿润、无干斑或滑移流淌现象。混凝土终凝2h后,采用喷水养护,养护时间为3d--7d。
7)工程质量检验标准
表1 工程质量检验标准
2.深基坑支护施工建议
通过分析目前深基坑支护所存在的普遍问题,结合工程实践,笔者提出深基坑支护施工建议,为同类工程所参考:
(1)全程控制基坑支护的施工质量。工程施工前,必须熟悉当地的地质资料、施工设计图纸及施工现场周围的环境,另外,降水系统应确保正常工作。施工单位在施工过程中不得随意改变锚杆位置、长度、型号、数量,钢筋网间距,加强筋范围,放坡系数等。设计方案变更时必须重新经专家评审。同时基坑支护施工单位要与挖土施工单位紧密配合,坚持分层分段开挖和分层分段支护的施工原则进行施工。土方开挖的顺序和具体开挖的方法必须与设计的工作情况相一致,并遵循“开槽支撑,先撑后挖,分层开挖,严禁超挖”的原则,减少开挖过程中土体的扰动范围,缩短基坑开挖卸荷后无支撑的暴露时间,对称开挖,均衡开挖,合理利用土体自身在开挖过程中控制位移的能力。深基坑开挖的过程中应采取措施以防止碰撞支护结构、工程桩或挠动基底原状土。有异常情况发生时,应立即停止挖土,并应立即查清原因和采取措施,深基坑开挖完成后,应提醒建设单位尽快组织勘察、设计、质监、监理、施工等部门进行验槽,及早开始地下结构工程的施工,严禁基坑长时间暴露。基坑回填前,支护层不能破坏,特别是坡脚部分。
(2)采取基坑支护施工信息监测与信息化施工技术。基坑工程力学参数的不确定性及施工过程的不可预见性,使基坑支护工程设计和施工中难免出现与实际地层条件不符合的情况,需要在施工过程中通过检测信息的反馈来修正设计,指导施工。因此,基坑支护工程监测是基坑工程施工中的一个重要的环节,组织良好的监测能够将施工中各方面信息及时反馈基坑开挖组织者,根据预测判定施工对周围环境造成影响的程度对基坑工程围护体系变形及稳定状态加以评价,并预测进一步挖土施工后将导致的变形及稳定状态的发展,制定进一步施工策略,实现信息化施工。
(3)深基坑支护的信息化管理随着现代社会的发展,计算机和网络已经应用到经济生活的各个领域,建筑行业也不例外。在进行深基坑支护工程时,同样需要我们利用现代化的信息技术,以提高工程效率。基坑支护结构的信息化管理主要手段是安排专业施工监测人员对基坑现场及周围建筑物进行监测,将基坑开挖期间监测到的基坑支护结构或岩土变位的情况数据化,比照勘察、设计的预期性状,及时对施工中可能出现的险情进行预报,超过预警值时可及时采取有效的应对措施排除危害,确保工程安全。
(4)深基坑支護工程施工中不确定因素很多,地质条件和施工条件又较为复杂,因此有必要对整个施工过程进行监测。这样,既可以对理论设计和预测的结果进行比较与验证,又可将监测的数据进行反馈,及时发现问题,指导施工进程,做到信息化施工。积累完整准确的基坑开挖与支护监测结果,对于总结工程经验,完善设计分析理论都是十分宝贵的。
3结语
总之,目前我国的深基坑工程已经积累了大量成功的经验,但也有不少失败的实例,这就要求今后要以更加严谨的科学态度,既重视工程经验,同时也十分注意理论指导,防患于未然,选择合理的深基坑支护结构,对各个施工环节、各个施工阶段,使基坑支护工程按期完工,相信一定可以取得了较好的社会效益和经济效益。
参考文献:
[1]胡侃.深基坑支护施工技术的研究与应用[J].低温建筑技术,2007,27(10):36-39
[2]崔江余,梁仁望.建筑基坑工程设计计算与施工[M].北京:中国建筑出版社,2001.
[3]刘国林,侯学渊,黄院雄.基坑工程发展的现状与趋势[J].地下空间,2007.
[4]郑刚.浅谈高层建筑的深基坑支护方案及施工要点[J],城市建设理论研究,2012.
关键词:高层;深基坑支护;施工要点;建议
Abstract: any building must have a good foundation, for large high-rise, super high-rise buildings, which is particularly important. With the emergence of a large number of city construction of tall and super high-rise buildings, more and more deep excavation. Therefore,deep foundation pit supporting attracted wide attention in all aspects. In this paper, soil nailing wall for examplediscusses the key points of construction and put forward some deep foundation pit construction proposal for reference exchange.
Keywords: high; deep foundation pit; construction;suggestion
中图分类号: TV551.4 文献标识码:A文章编号:2095-2104(2013)
深基坑施工是地下工程施工富于变化而又复杂的环节,其中深基坑支护施工是保证整个地下施工过程中基坑的安全,同时又要控制因开挖而引起的支护结构和周围土体的变形,以便保护周围环境(如相邻建筑及地下公共设施等)的重要组成部分。如果处理得不好对工程所带来的损失是不可估量的。本文就以土钉墙施工为例,探讨深基坑施工的要点。
1.深基坑施工要点
土钉墙施工工艺流程为:开挖基坑工作面、修整边坡→设置土钉或锚杆(包括成孔、置入钢筋、注浆、补浆)→铺设、固定钢筋网→喷射混凝土面层。
1)开挖土方。基坑要按设计要求严格分层分段开挖,在完成上一作业面土钉与喷射混凝土面层达到设计强度的70%以前,不得进行下一层土层的开挖(允许在距离四周边坡8~10m的基坑中部自由开挖)。当用机械进行土方作业时,超挖深度不得大于0.5m,边坡宜用小型机具或铲进行切削清坡,以保证符合设计边坡要求。对自稳能力差的土体,如高含水量的黏性土和无粘接力的砂土,可先进行喷射混凝土面层施工。
2)成孔施工。采用洛阳铲人工成孔,钻孔前定位:根据设计要求定出孔位,做出标记。钻孔采用回转钻进方式,钻进时采用清水循环护孔,反复循环,对孔口流出的泥浆不断清除残渣。在填土层地段应加大泥浆比重,以防塌孔。钻孔后应反复用泥浆循清孔,以清除孔内泥渣等残留物,成孔后应及时安置土钉钢筋并注浆。
3)土钉钢筋。土钉制作由钢筋班根据设计图纸要求在加工场进行。钢筋调直采用冷拉方法,钢筋的截断采用切割机,钢筋弯曲采用机械方法,依据设计要求进行加工成型。钢筋的纵向连接采用焊接,焊接处应置于钻孔深部。要按设计要求采用的钢筋的级别、钢号、直径分类堆放。钢材要有出厂质量证明书。验收内容:对标牌、外观进行检查并进行机械性能测试。钢筋焊接前必须根据施工条件进行试焊,合格后方可施焊。焊工必须持有上岗证,并须试焊合格。电焊条应具有合格证,钢筋在加工过程中如发现脆性断裂、焊接性能不良,显著的不正常现象应进行化学成分分析试验。钢筋在使用前要调直,制作钢筋须搭架并要求架体水平,土钉钢筋的主筋采用焊接,单面焊焊缝长度10d,双面焊5d。钢筋制作好后,经当班质检员与监理验收合格后,方可下入孔内。
4)注浆。水泥砂浆采用砂浆搅拌机,根据砂浆配合比试验参数进行砂浆搅拌,砂子必须过筛。根据设计要求数量,及时制作砂浆试样,认真养护,达到龄期后,在监理工程师监督下送指定实验站进行检验。注浆采用压力注浆机,注浆前应将孔内残留或松动的杂土清除干净,注浆时,注浆管应插至距孔底250~500mm处,孔口部位设置止浆塞。通过下入孔底的注浆管,一次完成注浆,注浆前必须用清水润滑管路,待砂浆溢出孔口后,一边注浆一边拔管直至注浆管全部拔出,及时冲洗注浆管路,结束注浆。二次补浆在一次注浆结束2h后进行,二次补浆必须将土钉孔完全注满方可结束。土钉钢筋置入孔中前,应先人工清孔并设置定位支架,保证钢筋处于钻孔的中心部位。
5)绑扎钢筋网。按设计要求绑扎、固定钢筋网。钢筋网片采用绑扎而成,铺设钢筋网时每边的搭接长度不应小于200mm。土钉与面层连接可用与土钉钢筋同直径的短钢筋头焊接牢固。喷射混凝土时钢筋网不得晃动。
6)喷射混凝土施工。采用分段分片依次进行,同一分段内喷射顺序自下而上,一次喷射厚度为30mm。喷射时,喷头与受喷面应垂直,保持600--1000mm的距离;施工过程中要控制好水灰比,保持混凝土表面平整、湿润、无干斑或滑移流淌现象。混凝土终凝2h后,采用喷水养护,养护时间为3d--7d。
7)工程质量检验标准
表1 工程质量检验标准
2.深基坑支护施工建议
通过分析目前深基坑支护所存在的普遍问题,结合工程实践,笔者提出深基坑支护施工建议,为同类工程所参考:
(1)全程控制基坑支护的施工质量。工程施工前,必须熟悉当地的地质资料、施工设计图纸及施工现场周围的环境,另外,降水系统应确保正常工作。施工单位在施工过程中不得随意改变锚杆位置、长度、型号、数量,钢筋网间距,加强筋范围,放坡系数等。设计方案变更时必须重新经专家评审。同时基坑支护施工单位要与挖土施工单位紧密配合,坚持分层分段开挖和分层分段支护的施工原则进行施工。土方开挖的顺序和具体开挖的方法必须与设计的工作情况相一致,并遵循“开槽支撑,先撑后挖,分层开挖,严禁超挖”的原则,减少开挖过程中土体的扰动范围,缩短基坑开挖卸荷后无支撑的暴露时间,对称开挖,均衡开挖,合理利用土体自身在开挖过程中控制位移的能力。深基坑开挖的过程中应采取措施以防止碰撞支护结构、工程桩或挠动基底原状土。有异常情况发生时,应立即停止挖土,并应立即查清原因和采取措施,深基坑开挖完成后,应提醒建设单位尽快组织勘察、设计、质监、监理、施工等部门进行验槽,及早开始地下结构工程的施工,严禁基坑长时间暴露。基坑回填前,支护层不能破坏,特别是坡脚部分。
(2)采取基坑支护施工信息监测与信息化施工技术。基坑工程力学参数的不确定性及施工过程的不可预见性,使基坑支护工程设计和施工中难免出现与实际地层条件不符合的情况,需要在施工过程中通过检测信息的反馈来修正设计,指导施工。因此,基坑支护工程监测是基坑工程施工中的一个重要的环节,组织良好的监测能够将施工中各方面信息及时反馈基坑开挖组织者,根据预测判定施工对周围环境造成影响的程度对基坑工程围护体系变形及稳定状态加以评价,并预测进一步挖土施工后将导致的变形及稳定状态的发展,制定进一步施工策略,实现信息化施工。
(3)深基坑支护的信息化管理随着现代社会的发展,计算机和网络已经应用到经济生活的各个领域,建筑行业也不例外。在进行深基坑支护工程时,同样需要我们利用现代化的信息技术,以提高工程效率。基坑支护结构的信息化管理主要手段是安排专业施工监测人员对基坑现场及周围建筑物进行监测,将基坑开挖期间监测到的基坑支护结构或岩土变位的情况数据化,比照勘察、设计的预期性状,及时对施工中可能出现的险情进行预报,超过预警值时可及时采取有效的应对措施排除危害,确保工程安全。
(4)深基坑支護工程施工中不确定因素很多,地质条件和施工条件又较为复杂,因此有必要对整个施工过程进行监测。这样,既可以对理论设计和预测的结果进行比较与验证,又可将监测的数据进行反馈,及时发现问题,指导施工进程,做到信息化施工。积累完整准确的基坑开挖与支护监测结果,对于总结工程经验,完善设计分析理论都是十分宝贵的。
3结语
总之,目前我国的深基坑工程已经积累了大量成功的经验,但也有不少失败的实例,这就要求今后要以更加严谨的科学态度,既重视工程经验,同时也十分注意理论指导,防患于未然,选择合理的深基坑支护结构,对各个施工环节、各个施工阶段,使基坑支护工程按期完工,相信一定可以取得了较好的社会效益和经济效益。