在武汉石油化工厂的建设中,采用充水倒装的施工方法,成功地组装了直径44米,高19.26米,总重590多吨的三万立方米浮顶油罐。采用充水倒装法组装浮顶油罐,较之其它施工方法,大大简化了施工手段,节省吊装机具,减少高空作业,因而施工作业面大,工效高,质量好,施工安全。主体工程只用了39个工作天,比计划工期提前35%完成了任务。
In the construction of the Wuhan Petrochemical Plant, a water-filled flipping method was used to successfully assemble a 30,000 cubic meter floating roof tank with a diameter of 44 meters, a height of 19.26 meters and a total weight of more than 590 tons. The use of water-filled flip-chip assembly floating roof oil tank, compared with other construction methods, greatly simplifies the construction methods, save lifting equipment, reduce high altitude operations, and thus the construction work surface is large, high work efficiency, good quality, construction safety. The main project only used 39 working days, 35% ahead of the planned schedule.