全过程监理是工程质量控制的基本方法。全过程监理是对某项工程质量的事前控制、事中控制、事后控制。事前控制是指对工程准备阶段的控制,如测量成果的复核,试验数据的审批,施工工艺的慎重推敲等;事中控制是指对工程施工过程的控制,如突发事件的处理,人为因素的监督等;事后控制是指工程结束后质量的控制,如砼强度不足的返工处理,在不影响内部质量下的修整等。
The whole process of supervision is the basic method of project quality control. The whole process of supervision is a project of quality control in advance, things in control, after control. Pre-control refers to the control of the project preparation stage, such as the review of measurement results, examination and approval of test data, construction process carefully scrutiny, etc. Control refers to the project construction process control, such as handling of emergencies, human factors Supervision, etc .; post-control refers to the quality control after the end of the project, such as the lack of rework concrete strength, without affecting the quality of the internal trim and so on.