高大模板支架的坍塌事故往往发生在施工过程中。通过对15 m高模板支架的现场调查和实测,统计获得了模板支架搭设参数。研究发现:模板支架在搭设过程中随机性较大,因此应对该结构的搭设实施全过程管理,确保实际搭设参数与专项施工方案的一致性;测得立杆的应力值均小于预分析时立杆的应力,凸显出JGJ 130—2011《建筑施工扣件式钢管脚手架安全技术规范》所提出的荷载组合过于保守;同一立杆底部的应力大于顶部的应力,说明水平杆及竖向剪刀撑是有一定调节作用的;立杆的应力与架体的搭设高度有关,支架高度越高,底部和顶部的应力差异越大。所得结果可为模板支架的设计提供数据支持。
Collapse of tall formwork brackets often occur during construction. Through the field investigation and measurement of 15 m high formwork stent, the parameters of formwork stent were obtained. The research found that the template supports are quite random in the erection process, so the erection of the erection structures should be managed in the whole process to ensure the consistency between the erection parameters and the special construction schemes. The stress of the bar highlights the combination of the load combinations proposed in JGJ 130-2011 Safety Specifications for Construction-Fastener Steel Pipe Scaffolding; the stresses at the bottom of the same column are greater than those at the top, indicating that the horizontal bar and the vertical scaffold are There is a certain regulatory role; pole of the shelf body and the mounting height of the stent height is higher, the greater the difference between the bottom and top of the stress. The results provide data support for the design of the template scaffolds.