水利工程规模大、工期长、技术复杂、投资大、质量要求高、资源需求大、影响因素多,这些特点增加了水利工程施工阶段控制的风险。对此,本文应用网络计划的方法,研究水利施工中“工期—费用”的优化问题,以寻求工程工期与工程费用之间的均衡,降低其风险。
Large-scale water conservancy projects, long construction period, complex technology, large investment, high quality requirements, resource requirements, the impact of many factors, these characteristics increase the risk of construction phase of water conservancy project control. In this regard, this paper applies the method of network planning to study the optimization problem of “duration-cost” in water conservancy construction in order to find the balance between project duration and project cost and reduce the risk.