顶管工程在管道贯通之前,所有的管节都处于活动状态,采用传统的注浆法抬升会增加管道外壁的摩擦力,影响后续的顶进施工。某穿越黄浦江的大直径顶管工程在顶进过程中发生沉降,为了不影响后续顶进施工,采用了特种注浆技术并结合管内顶升的施工方案,并采用有限元软件对其进行了施工模拟和分析,用来指导和调整施工方案,最终实现了管道的抬升和后续管道的顺利顶进。
Pipe jacking project before the pipe through, all the pipe joints are in the active state, the use of traditional grouting lifting will increase the outer wall of the pipeline friction, affecting the follow-up jacking construction. A large-diameter pipe jacking project across the Huangpu River subsides during the jacking process. In order not to affect subsequent jacking construction, a special grouting technology is adopted in combination with the construction plan of jacking in the pipe and the finite element software is used Construction simulation and analysis, used to guide and adjust the construction program, and ultimately to achieve the pipeline uplift and smooth follow-up pipe advance.