论文部分内容阅读
水利水电工程具备只自身的特殊性,因此在对水利水电工程进行现场管理工作时也具备较大的困难,这与水利水电工程的位置也结整个工程工序繁复有关,大多数的水利水电工程所处的位置都非常的偏僻,同时地质条件很差,在施工过程当中会受到水文以及地质灾害等各种因素的影响,时光当中所涉及的工艺以及施工技术多种多样,因而对于现场管理工作带去了非常大的安全隐患,从这些实际情况来看,对于现场安全管理工作所提出的要求也就更高,下面文中将会对现场管理当中存在的问题进行阐述,并提出相应的措施,供大家参考。
Water conservancy and hydropower projects have their own uniqueness, so in the on-site management of water conservancy and hydropower projects also have greater difficulty, which is the location of the water conservancy and hydropower project also complicated the entire project process complicated, most of the water conservancy and hydropower engineering The location is very remote, at the same time the poor geological conditions, during the construction process will be hydrological and geological disasters and other factors, the time involved in the process and construction techniques varied, and therefore for the site management work with Went to a very big security risk, from these actual situation, the requirements for on-site safety management also higher, the following text will be on-site management problems that are existent and put forward corresponding measures for Everyone’s reference.