1999年12月1日,莲花水电站工程竣工档案经国家验收委员会严格考核检查,顺利通过国家验收。莲花水电站是“八五”期间由国家和我省联合投资兴建的大型水电工程,总装机容量55万千瓦,年发电量7.97亿千瓦时,是我省建国以来兴建的第一座大型水电站,将全省可开发利用的水能源由原来的2.7%提高到11%。该工程设计技术指标高,涉及面广,施工单位多,工程档案资料收集、整理难度大。经由国家电力公司、国家档案局等有关单位组成的莲花水电站工程竣工档案验收委员会
December 1, 1999, Lotus Hydropower Station project completion file by the State Inspection Commission strict examination, passed the national inspection. Lianhua Hydropower Station is a large-scale hydropower project jointly invested by the state and our province during the “1985” period with a total installed capacity of 550,000 kilowatts and an annual generating capacity of 797 million kilowatt hours. It is the first large-scale hydropower station built since the founding of our province , Will be the province’s development and utilization of water energy from the original 2.7% to 11%. The engineering design of high technical indicators, involving a wide range of construction units, project archives data collection, finishing difficult. Through the State Power Corporation, the National Archives and other relevant units of the Lotus Hydropower Project Completion File Acceptance Committee