本工程基坑面积3.2万m2,地下2层,设有2道钢筋混凝土内支撑。由于基坑底板采用跳仓法施工,易造成工期延长等对基坑变形控制不利的因素,所以地下混凝土结构采用了“整体跳仓法”施工技术。施工只需设置临时施工缝[1],解决了土方开挖有效控制基坑变形、立体穿插施工、底板施工与土方开挖独立进行等关键技术问题。
The project pit area of 32000 m2, 2 floors underground, with 2 reinforced concrete support. As the pit floor hopper method of construction, can easily lead to extended duration of pit deformation control and other unfavorable factors, so the underground concrete structure using “overall hopper method ” construction technology. The construction only needs to set up temporary construction seams [1], which solves the key technical problems such as the effective control of excavation of earth excavation deformation, three-dimensional interspersed construction, floor construction and earth excavation independently.