水电站无压引水隧洞非恒定流模型试验研究

来源 :四川水利 | 被引量 : 0次 | 上传用户:yyy021
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
水电站无压引水隧洞在运行中会出现非恒定流水力现象,而物理模型试验则是确定这类无压引水隧洞非恒定流水力参数的重要手段。本文通过具体工程应用实例,介绍了无压引水隧洞非恒定流模型试验的模型率和设计方法,指出模型试验材料决定了无压隧洞正态模型试验的比尺。在无压隧洞靠近下游段设置溢流弃水堰,在有压隧洞前设置大底坡连接过渡段,对控制无压隧洞内的非恒定流水力危害是十分有效的工程措施。 The non-pressure diversion tunnel of hydropower station will have unsteady flow during operation, while the physical model test is an important means to determine the unsteady flow parameters of this kind of pressureless diversion tunnel. In this paper, the model rate and design method of unsteady flow model test for pressureless diversion tunnel are introduced through concrete engineering examples. It is pointed out that the model test material determines the scale of normal model test of pressureless tunnel. It is very effective engineering measures to control the unsteady flow hydraulic hazards in the pressureless tunnel by setting overflow weir in the downstream section near the pressureless tunnel and setting the transition section of the large bottom slope before the pressure tunnel.
其他文献
本文略语 AA 花生四烯酸 GC 鸟苷酸环化酶 AC 腺苷酸环化酶 PDE 磷酸二酯酶 ADP 二磷酸腺苷 PGE_1 前列腺素E_1 ATP 三磷酸腺苷 PGG_2 前列腺素G_2 Ca~(++) 钙离子 PGI_2 前
期刊
期刊
期刊
期刊
摘 要 在项目工程中,路桥施工是一项比较特殊的工程。具备承接大型路桥施工能力的企业凤毛麟角,路桥施工项目需要施工企业资金雄厚、投资规模较大且可承担较长施工期与资金回收期等综合能力。施工企业只有联合其它投资设计、资金、施工评价等不同环节才能确保路桥工程如期实施。因此,只有综合考虑因素并采取合理措施才能提高路桥施工的综合管理水平。  关键词 施工管理;项目管理;影响因素  中图分类号:U41 文献
通过文献资料法、调查访问法、对比分析法结合现实分析高校篮球运动员训练疲劳多元化因素,分析在“手游”时代高校篮球运动员训练后疲劳恢复的新角度;针对性地提出简易有效的
本文通过对荣华二采区10
期刊
期刊
期刊