论文部分内容阅读
汤普逊矿分层充填采矿法自1961年开始生产以来,经历了重大的变化,几乎回采作业的所有工序都发生了变化。从最早的木淄槽与风动耙子到现今的天井钻孔,底盘矿石淄井和铲运机。本文是描述机械化充填采矿法的演变,着重于采场和服务性巷辺,矿山支护方法,水力充填以及通风系统设计方百的变化。介绍一个机械化采区从最初的采矿概念到设计,开拓,采准和采矿循环的全过程。
The Thompson Mine Stratified Filling and Mining Act has undergone major changes since its production began in 1961 and has changed almost all operations in the recovery operations. From the earliest Muzi trough and wind rakes to the current patio drilling, chassis ore Zibo and scrapers. This article describes the evolution of the Mechanized Fill Mining Act with a focus on changes in stope and service laneways, mine support methods, hydraulic filling, and ventilation system design. Describe a mechanized mining area from the initial concept of mining to the design, development, mining and quasi-mining cycle of the entire process.