我公司1 000t/d生产线自2005年3月投产后,受石灰石品质波动大的影响,生料和熟料的质量不够稳定。因此,于2010年3月在Φ3.5m×10m中卸生料磨入磨前安装了澳大利亚SCANTECH公司生产的γ
After the 1000t / d production line of our company was put into production in March 2005, the quality of raw materials and clinker is not stable enough due to the big fluctuation of limestone quality. Therefore, in March 2010 in Φ3.5m × 10m unloading raw materials into the grinding mill before the installation of the Australian SCANTECH γ