2010年上海世博会中国馆B3区为中国馆裙楼的组成部分之一,该区坐落在地铁M8号线车站上方,故设置四根托换梁托住上部结构,使其与地铁站顶盖完全脱离。托换梁采用空腹预应力混凝土梁,最大跨度达45m。托换梁在施工和使用过程中受荷下沉,导致上部结构的柱脚支座产生不均匀沉降和转动,增大了上部结构的内力,故设计和施工时采用改变支承边界条件的方法:即施工阶段柱脚铰接,而使用阶段柱脚刚接,采用该方法减小了上部结构的弯矩值,在节省用钢量方面有一定效果。
Section B3 of the China Pavilion at the 2010 Shanghai World Expo is one of the components of the podium of the China Pavilion. The district is located above the M8 MTR station. Therefore, four underpinning beams are provided to support the superstructure so as to completely cover the top of the subway station Detached. Boom beam using fasting prestressed concrete beams, the maximum span of 45m. Underpinning beams are subjected to load sinking during construction and use, resulting in uneven settlement and rotation of the column foot support of the superstructure, which increases the internal force of the superstructure. Therefore, the design and construction method is to adopt the method of changing the support boundary conditions: That is, the construction phase of the column foot hinge, and the use of phase column just connected, the use of this method reduces the bending moment of the superstructure, in the amount of saving steel has a certain effect.