1 顶升前的注意事项 1)顶升作业应在白天进行,如果遇特殊情况,需要在夜间作业时,必须备有充足的照明设备。 2)顶升前必须放松电缆,使电缆放松长度略大于总的爬升高度,并做好电缆的紧固工作。 3)应按塔机说明书规定仔细、耐心地调整顶升部分重心位置,使其重心线位于顶升油缸轴线上。保证顶升平稳,减轻液压系统负荷。确定重心位置时,应参考塔机说明书给出的位置,通过试顶升5~10mm,仔细观察顶升与被顶升部分的间隙是否均匀和压力表读数是否最小来实际确定调整位置。 4)顶升前液压管路应充分排气,油液应保持清
1 Precautions before jacking 1) jacking operation should be carried out during the day, in case of special circumstances, the need for night work, you must have adequate lighting equipment. 2) Before lifting, you must relax the cable so that the length of the cable is slightly longer than the total height of the climb and make the cable tightening work. 3) Carefully and patiently adjust the position of the center of gravity of the jacking up so that its center line of gravity is on the axis of the jacking cylinder. To ensure a smooth rise, reduce hydraulic system load. The position of the center of gravity should be determined by referring to the position given by the tower crane instruction manual and actually ascertaining the adjustment position by carefully testing the top of the tower for 5 to 10 mm and carefully observing whether the gap between the top and the top of the tower is even and whether the pressure gauge reading is the minimum. 4) Before lifting hydraulic piping should be fully discharged, the oil should be kept clear