论文部分内容阅读
据悉,近日,新疆第二条沙漠公路阿拉尔—和田公路在洛浦县吉亚乡正式开工建设。新疆第一条沙漠公路于1995年9月建成通车,主要是石油部门为开发塔克拉玛干沙漠腹地中的油田而兴建的。该公路北起巴音郭楞蒙古自治州轮台县314国道,南到塔克拉玛干沙漠南缘的和田地区民丰县,全长522km,其中约有440km 穿越沙漠地带。它的建成使轮台县至和田地区的路程缩短了500km。按规划,第二条沙漠公路全长424km,是未来国道217线的延长线,其中位于沙漠中的路
It is reported that, recently, Xinjiang’s second desert highway Alar - Hotan Road in Luopu County Jiasiang officially started construction. The first desert highway in Xinjiang was opened to traffic in September 1995, mainly because the oil sector was built to develop oil fields in the hinterland of the Taklamakan Desert. It runs 314 National Road in Luotai County, Bayinguoleng Mongolia Autonomous Prefecture to the north and Minfeng County in the Hetian area to the south of the Taklamakan Desert, with a total length of 522km, of which about 440km cross the desert. Its completion shortened the distance from Luntai to Hetian by 500km. According to the plan, the second desert highway is 424km in length, which is an extension of the future Route 217, of which the road in the desert