The CYCIAE-100 is a high intensity cyclotron.The beam intensity is 200μA.The energyrange is 75-100 MeV.The beam extraction system is made of the stripping target.The acceler-ated beam will be stripped off two electrons by membrane into protons.The proton beam will be led along the line.At the beginning of 2016,the The CYCIAE-100 is a high intensity cyclotron. The beam intensity is 200 μA. The energy range is 75-100 MeV. The beam extraction system is made of the stripping target. The acceler-ated beam will be stripped off two electrons by membrane into protons The proton beam will be led along the line .At the beginning of 2016, the
其他文献
The spent fuel dissolver is the key core equipment for the reprocessing plant.In order to meet the requirement of nuclear critical safety experiment,the core of
目的观察中西医结合治疗小儿支原体肺炎风热郁肺型的临床疗效,评价其安全性,旨在为临床治疗提供一定的参考。方法将128例支原体肺炎风热郁肺型患儿随机分为对照组和治疗组,每
“Research on the Key Technology and Engineering of the Medical Cyclotron”is the core ability promotion project of“Long Teng 2020”science and technology inno
There are three beam lines in south direction of BRIF:two neutron source and single particle effect beam line.In 2016,the construction and commission of these b
The spent fuel dissolver is the key equipment in the reprocessing plant.In order to meet the experimental demand of nuclear criticality safety research,after ha
As the third generation nuclear system,the design life of AP1000 can reach more than 60 a.Since the operation of the nuclear power plant,spent fuel pool began t
北京放射性离子束装置(BRIF)是国家投资数亿元的大科学工程,现已竣工试运行,填补了我国在IS()L型放射性离子束装置方面的空白。该装置由一台强流质子回旋加速器、离子源、在
Shearing machine system,as the first part of the post-processing head end,has a pivotal role and the development of its equipment has been one of the difficulti
作为第3代核电系统,AP1000的设计使用寿命可达60 a以上。核电站开始运行后,乏燃料水池随之开始使用,因此需对乏池贮存格架的中子吸收体在60 a寿期内的有效性进行监测,以保证
Post irradiation examinations(PIE)on AFA-3G fuel rods were performed in CARR hotcell and 303 hotcell,the failure cause analysis was also conducted.The main meth