论文部分内容阅读
(接上期)四.吊臂系统拆卸与安装1.总成拆卸与安装(1)注意事项①仔细研究吊臂构造并决定拆卸顺序和拆卸程度,拆卸时,应记录有助于组装的各个事项。②不司用力过猛,也不要分解过度。③分解时,场地应符合下列条
(Continued) IV. Removal and Installation of Crane System 1. Assembly Removal and Installation (1) Precautions ① Carefully study the structure of the boom and determine the disassembly order and degree of disassembly. During disassembly, all items that contribute to the assembly should be recorded . ② Do not force too hard, do not over-decomposition. ③ decomposition, the venue should meet the following