在狭小的施工场地内,合理接排施工顺序,选用适当挖土机械,以及采取筑垫层、后拆支撑等措施,赢得了施工的主动和成功.
In the narrow construction site, the construction sequence was actively and successfully achieved by rationally arranging and arranging the construction sequence, selecting appropriate excavation machinery, and adopting measures such as building cushions and post-removal support.