论文部分内容阅读
2012年7月,焦作瑞丰动力车间水处理工段积极响应公司节能降耗内部挖潜的号召,充分利用化机浆、浆板机满负荷运行的良好时机,针对来水量大,COD含量波动小,适合系统化处理的特点,加强工艺控制,严把厌氧、好氧、压泥、深度处理等每道处理工序,使系统运行处于良好状态,在确保达标
In July 2012, Jiaozuo Ruifeng Power Plant Water Treatment Section actively responded to the call for internal tapping potential of energy-saving and consumption reduction of the Company to make full use of the good opportunity of full-load operation of chemical-based pulp and padder. In view of large amount of water flow, small fluctuation of COD content, Suitable for the characteristics of systematic treatment, strengthen the process control, strict anaerobic, aerobic, pressure mud, depth processing, and so on each treatment process, the system is running in good condition, to ensure compliance