我厂区地形较平坦,四周紧临农舍耕地。做好尾矿坝的管理,是我厂的一项重要任务。概况 尾矿坝有两个主坝和三个副坝。三个副坝比较分散,一次堆成。主坝在初期坝的基础上用尾矿堆筑小坝的方法不断增加高度。目前,两个主
My factory area is relatively flat, surrounded by farmhouse farmland. Tailings dam management, is an important task of our plant. The Tailings Dam has two main dams and three auxiliary dams. Three sub-dam more dispersed, a pile into. The main dam on the basis of the initial dam tailings piled small dam method continues to increase the height. At present, two main