潞王坟试验段承担着南水北调工程膨胀岩(土)试验研究任务,目的是提供安全可靠、经济合理和有利于环保的技术措施,指导总干渠膨胀岩(土)段的大面积施工。对土工格栅+膨胀岩开挖料处理措施投入的人、材、机消耗量进行现场测算,真实分析施工成本情况,为优化技术方案提供依据。
The test section of Luwangfen undertakes the experimental research task of expanding rock (soil) of the South-to-North Water Diversion Project in order to provide safe, reliable, economical and environmentally friendly technical measures to guide the large-area construction of the expanded rock (soil) section of the main canal. The geogrid + expansion rock excavation materials put into the human, timber, machine consumption on-site estimates, the real analysis of construction costs, to provide the basis for the optimization of technical programs.