Since the research on verification to passive design strategies in sustainable building is at the initial stage,and its test method and verification conclusion
The samples cut from U75V 60 kg/m heavy rail are heated to 900 ℃ in resistance furnace and then put into air spraying channel to be cooled for 80 s, and change