论文部分内容阅读
重庆市在实行水土保持方案报批管理制度后,推动全市4950个生产建设项目编报了水土保持方案,培养了几十个水土保持方案编制单位和一大批水土保持方案编制队伍,为推动水土保持工程与主体工程同时设计、同时施工、同时投入使用制度(简称“三同时”)的有效实施,提高水土流失预防监督能力和水土流失治理水平打下了基础。
Following the implementation of the approval management system for soil and water conservation programs, Chongqing Municipality promoted 4,950 production and construction projects in the city to compile plans for soil and water conservation, trained dozens of water and soil conservation plan preparation units and a large number of soil and water conservation plan preparation teams, and promoted soil and water conservation projects And the main project at the same time design, construction and at the same time put into use the system (referred to as “three at the same time ”) effective implementation, improve soil erosion prevention and supervision capacity and soil erosion control laid the foundation.