某油田开发进入高含水期后,注水符合率下降较快,因此要加细注水层段、加密测试周期的工作要求。对注水井测调周期调整后,年测调工作量增加50%以上,若再考虑稳产期间注水井数日益增多因素,测调队伍与工作量间的矛盾将更加突出。在测调队伍不增加的情况下,只有通过提高注水井测调效率才能解决这一问题,为此开展了双流量智能测调技术及配套技术研究,首次提出了注水井流量测试与调整实时同步的技术思路,改变了常规技术测调分开、投捞更换不同水嘴调节流量的传统工作方式,建立了一套全新的注水井分层测调技术体系,并在推广应用中得出一些结论认识。
After the development of an oilfield enters the high water cut period, the coincidence rate of water injection drops rapidly, therefore, the work requirements of the water test interval should be added. After the adjustment period of water injection wells is adjusted, annual survey workload will increase by more than 50%. If we consider the increasing number of water injection wells during stable production, the contradiction between survey teams and workload will be more prominent. In the case of the survey team does not increase, only by increasing the efficiency of water injection wells to solve this problem, this study has carried out dual-flow intelligent measurement technology and supporting technology research for the first time put forward the injection well flow test and adjust the real-time synchronization The technical idea of the invention changes the traditional working methods of measuring and regulating the conventional technology separately and adjusting and adjusting the flow rate of different water faucets by fishing in order to establish a new set of layered measuring and adjusting technical system of water injection wells and draw some conclusions in popularization and application .