论文部分内容阅读
1现状1.1工务大修基地所处的历史背量随着铁路发展的不断深入,上海铁路局正以“打造精品局,创一流企业”战略思想加快发展,力争率先实现东部铁路现代化,各城际铁路、高速铁路、即有线升级改造、第六次大提速等铁路建设不断掀起新的高潮。在各项建设过程中对即有部分站场设备、基地重新调整利用在所难免。从我局所处的外部环境看,“长三角”地区是我国经济最具活力、最发达的地区之一,目前正值历史上最好的发展机遇期和新一轮经济增长期,各城市之间竞争激烈,发展态势不断加强。同时国家对土地管理和控制更加严格规范,造成城市供地日趋紧张,在新一轮城市规划建设中,即有铁路用地(特别是一些基地)陆续被纳入城市建设用地,一些基地将被征用拆迁,另需选址重建,这其中就包括工务大修基地。
1 Status quo 1.1 Historical Overhaul of Public Works Overhaul Base With the continuous development of the railway, the Shanghai Railway Bureau is accelerating the development of its strategic thinking of “building a quality bureau and building a first-rate enterprise”, and strives to be the first to modernize the eastern railways. International railways, high-speed railways, that is, cable upgrade, the sixth largest speed and other railway construction continue to set off a new upsurge. In the course of the construction of some stations that are equipped with equipment, base re-adjust the use of inevitable. From the perspective of the external environment in which our bureau is located, the “Yangtze River Delta” region is one of the most dynamic and developed regions in our economy. At present, it is one of the best development opportunities and a new period of economic growth in history. The competition among cities is fierce, and the development trend is continuously strengthened. At the same time, the state is stricter in regulating land administration and control, resulting in a tighter day for urban supply. In the new round of urban planning and construction, railroad land (especially some bases) will be gradually included in urban construction land and some bases will be expropriated and relocated , Another need to rebuild the site, which includes the overhaul of public works base.