Sedimentary facies of the Silurian tide-dominated paleo-estuary of the Tazhong area in the Tarim Bas

来源 :石油科学(英文版) | 被引量 : 0次 | 上传用户:sharongd
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
As the relative sea-level rose,a paleo-estuary was formed by the marine inundation of the braided river incised valley during the period of the lower sub-member of the upper member of the Kalpingtage.formation of the Silurian in the Tarim Basin,west China.Sandstone-mudstone rhythmite,tidal structures and bimodal cross-bedding are common in these deposits,indicating that tides played a significant role in generating the sedimentary structures and the estuary type was tide-dominated.Five depositional facies were grouped: tidal river,sandy and muddy subtidal fiat,tidal fiat,tidal bar,tidal channel on the basis of lithology,electric properties,rhythmicity,sedimentary structure,fossil and the contact relationship.The sediment distribution showing first fining seaward and subsequent coarsening seaward from head to mouth,implies the two sediment sources in the paleo-estuary.The paleo-estuary of the Tarim Basin is very different from other representative estuaries.The most important distinction is that there are two adjacent estuaries joined by tidal flat onshore and by sandy and muddy subtidal flat in the sea at the same time,while the others only have one.So the Tazhong paleo-estuary shows a good architecture model for the tide-dominated estuary.
其他文献
讨论了利用C++Builder构造应用程序的长处,介绍了几种与用户界面紧密相关的可视控件的设计技巧,利用这些控件自身的能力得到了较丰富实用的个性化界面,以增强程序的可靠性并拓宽
近年来,中国航空工业集团公司(简称:中航工业)积极推进效能监察工作,不断适应新形势新任务的要求,针对企业发展实际,导入知识管理理念,积极构建效能监察知识管理系统,在实现
乒乓球作为我国的常盛项目,在世界处于领先地位.随着乒乓球比赛规则的不断演变,对乒乓球运动员的技战术也有了更高的要求,但技战术的领先并不能成为衡量一个运动员的全部标准
高原神曲rn这幅图片拍摄于青海察汉诺,表现的是我国青藏高原建成的第一条电气化铁路——青藏铁路西格二线.因为胡斌集诗人、编辑、摄影家于一身,学养使然,他的作品中充溢着崇
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
产品数据管理(PDM)维护企业产品数据的完整性、安全性,动态地控制产品生产设计过程.对于部门级系统,项目管理具有重要作用,项目管理开始一个产品的生命周期,从而开始产品的设计过程,使得
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
The oil sands deposits in the West Canada Sedimentary Basin (WCSB) comprise of at least 85% of the total immobile bitumen in place in the world and are so conce
洛阳石化分公司炼油厂一套催化装置的UOP技术改造工程,工期短,拆除、安装、恢复工程量大,施工场地狭窄,高空作业、交叉作业多,施工环境恶劣。为克服上述不利因素,洛阳石化隆