论文部分内容阅读
文章结合某水库双曲拱坝工程实例,对改善拱坝坝肩及其岩体稳定的工程措施做了阐述。
Combined with the project example of a reservoir double-curvature arch dam, this paper elaborates the engineering measures to improve the stability of arch dam abutment and its rock mass.