针对季冻区隧道渗漏水与冰冻产生的原因,提出了采用防水、排水、保温、供热等方法进行综合防治的工程措施,其中包括:防水板选用低温性能好的材料,并在防水层敷设前尽量降低喷射混凝土表面的粗糙度,以保持防水层的长期完好;在衬砌施工缝中,采用先排后堵的可排水止水带;在衬砌下隅角背后,设置保温层,并使之防潮;在衬砌紧靠防水层一侧,设置环向电加热带,必要时通电加热使上部渗水顺畅下排。
Aiming at the reasons of seepage water and freezing in the tunnel in quarry area, some engineering measures such as waterproofing, drainage, heat preservation and heating are put forward, which include: Laying as far as possible to reduce the roughness of the surface of the shotcrete in order to maintain long-term waterproof layer intact; in the lining of construction joints, the drainage row after the first row of drainage can be used; lining behind the corner, set the insulation layer, and to make Moisture; in the lining close to the waterproof layer side, set the ring to the electric heating zone, if necessary, electric heating so that the upper seepage water smoothly under the row.