从工程源头抓 ,严把勘察设计优化效益关省局下达我市第一批农村电网建设与改造计划后 ,我局及时成立了以总工程师为组长 ,由生技、农电、调度、运行等部门专业技术人员为成员的农改工程技术小组 ,根据有关《规程》的规定 ,从优化设计入手 ,用200多个工作日对第一批农改任务
Grasping the source of the project and strictly inspecting and optimizing the benefits of survey and design. After the Provincial Bureau issued the first batch of plans for the construction and transformation of rural power grids in the city, the Bureau set up a team of chief engineers in a timely manner, with biotechnology, rural power, dispatch, and operation. The agricultural reform engineering and technical team with professional and technical personnel of other departments as members, according to the provisions of the “Regulations”, starting from the optimization design, with more than 200 working days for the first batch of agricultural reform tasks