本文根据古交矿区西曲矿井的实际建设经验,介绍分期建设矿井的投产标准及确保矿井早日达产的主要关键问题。
Based on the actual construction experience of Xiqu Mine in Gujiao Mining Area, this paper introduces the production standards of staged mine construction and the key issues to ensure that the mine can reach production as soon as possible.