40 Cr商用车前轴早期断裂失效分析

来源 :塑性工程学报 | 被引量 : 0次 | 上传用户:wyf1233
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
为探讨40Cr商用车前轴在装车后早期出现断裂失效现象,通过对断口进行宏、微观分析,确定该断裂属于典型晶间脆性断裂。结合金相组织检查、力学性能测试与应力分析探讨了断裂原因,一是由于前轴锻后淬火时,颈部截面心部冷却速度较慢,析出大量网状铁素体与粗大针状马氏体,并且该部位回火不充分,形成少量韧性较差的回火托氏体,不合理的热处理工艺导致颈部截面心部区域力学性能明显低于边缘区域;二是由于车辆行驶时,该处在交变载荷的作用下产生原始裂纹,当车辆制动时,此处实测剪切应力低于许用剪切应力,导致心部裂纹迅速扩展,最终边缘区域过载导致前轴断裂。 In order to investigate the fracture failure of 40Cr commercial vehicle front axle after loading, macroscopic and microscopic analysis of the fracture shows that the fault belongs to typical intergranular brittle fracture. Combining the metallographic examination, mechanical property test and stress analysis, the causes of fracture are discussed. First, when the front axle is forged and quenched, the core part of the neck has a slower cooling rate. A large amount of meshed ferrite and coarse needle- Body, and the tempering of the site is not sufficient, the formation of a small amount of poor toughness of the tempering, unreasonable heat treatment process led to the neck section of the core area of ​​the mechanical properties were significantly lower than the edge area; second is due to vehicle driving, the Under the action of alternating load, the original crack is generated. When the vehicle is braked, the measured shear stress here is lower than the allowable shear stress, resulting in the rapid expansion of the heart crack and eventually leading to the rupture of the front axle.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
针对连续挤压-冷轧铜板带工艺,分析14mm×290mm的纯铜板坯及其冷轧轧制变形量分别为70%、89%(含退火)共4种铜板的显微组织结构和力学性能。结果表明,挤出板坯的横纵截面组织
我地位于秦岭南麓中段深山地区,又处凉亚热带向暖温带过渡地段,总的概貌是:九山半水半分田。版图辽阔,地形复杂,气候差异较大,因为水稻是感光性敏感的作物,而种植多分布在海拔高度344~1298m
中空结构轴类件具有显著减轻轴重的优势,但其成形制造困难。文章提出楔横轧层合轴的思路,应用DEFORM-3D软件对楔横轧同种材料层合轴和单层轴的成形过程进行有限元数值模拟,得
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥