自 1 998年推行“三项制度”以来 ,黄河下游防洪工程的建设管理取得了很大成绩 ,但也存在施工进度缓慢、工程结算和施工管理不规范、个别施工工序控制不严、堤沟河影响防洪安全等问题。分析认为 ,当前的防洪工程建设应抓紧解决以下 6个方面的问题 :普及基本建设知识 ;加强对工程结算和支付工作的管理 ;取消下游防洪工程施工图设计阶段 ;进一步加强质量管理 ;适当提高赔偿单价 ;抓紧淤填堤沟河
Since the implementation of the “Three Systems” in 1998, great achievements have been made in the construction and management of flood control projects in the lower reaches of the Yellow River. However, construction progress has been slow, construction settlement and construction management have not been standardized, individual construction procedures have been under strict control, Affect flood control and other issues. Analysis shows that the current flood control project should pay close attention to the following six aspects of the problem: popularize the knowledge of basic construction; strengthen the project settlement and payment management; cancel the downstream flood control construction design phase; further strengthen quality management; Unit price; pay close attention embankment ditch river