水利水电工程造价管理是指在工程建设的全过程中,全方位、多层次地运用经济、技术、法律等手段,对工程造价进行预测、分析、计算、监督、管理、控制,是一项系统工程。作为建设方应采用系统综合的方法对建设全过程包括工程建设的前期、中期和后期进行控制。杜绝概算超估算、决算超概算的现象发生,合理、有效地控制工程造价,使投资获得最大经济效益和社会效益。
Water conservancy and hydropower project cost management refers to the whole process of construction, all-round, multi-level use of economic, technical, legal and other means of project cost forecasting, analysis, calculation, supervision, management, control, is a system engineering. As the construction side should adopt a systematic and integrated approach to the construction of the whole process, including the construction of the early, mid and late control. Elimination of budget estimates over estimates, over budget estimates of the phenomenon occurred, reasonable and effective control of project cost, the investment to maximize economic and social benefits.