论文部分内容阅读
本文对陕西石泉水电厂~#2机组轴系折弯(上导摆度偏大)的原因进行了分析,并制定了针对性的处理工艺,对于该问题的处理,积累了一定的经验,供同行参考。
In this paper, the reasons for the bending of Shaft ~ # 2 Shaft of Shaanxi Shiquan Hydropower Plant (the upper bearing is too large) are analyzed, and the targeted processing technology is developed. For this problem, some experiences have been accumulated for Peer reference.