论文部分内容阅读
在高纬度严寒地区冬季施工,需要解决的问题是:如何保障浇筑过程的连续性和运输过程的快速性,养护措施的可靠性是实现激凝土耐久性的关键.
In winter in high latitudes and cold areas, the problems to be solved are: how to ensure the continuity of pouring process and the rapidity of transportation process, and the reliability of curing measures are the key to the durability of concrete.