实际的水利工程施工中,会出现不得不在软土、沙质和松软等不良地基上进行的情况,这样的情况不但会造成水利工程施工期限的过度延长,而且会造成资源和财力上的浪费,还会对水利工程产生长期不稳定的影响,水利工程施工和科研部门需要对这样的建设现实和施工实际有所掌握和预期。本文就近年来水利工程对不良地基的加固经验进行了梳理,提供了水利工程不良地基的施工方法,提出了水利工程不良地基加固、密实处理的方法和措施。
In actual construction of hydraulic engineering, there will be situations that have to be carried out on soft foundations such as soft soil, sandy soil and soft ground, which will not only prolong the construction period of water conservancy projects, but also result in the waste of resources and financial resources, But also have a long-term instability on water conservancy projects. Construction and research departments of water conservancy projects need to grasp and anticipate such construction realities and actual construction. In this paper, the water conservancy projects in recent years on the adverse reinforcement of the experience of combing to provide a poor foundation for hydraulic construction methods, put forward the adverse reinforcement of hydraulic projects, solid methods and measures.