论文部分内容阅读
随着我国城镇化建设的快速推进,建筑业得到迅速的发展,房屋建设工程项目也很多,塔机在房屋建设中的使用已十分普及。由于塔机是特种设备,塔机的操作和管理需要经过专业培训的持证人员,且塔机是一种需要在施工现场安装和拆缷的施工机械,工地转移频繁,一般塔机使用不超过一年,少则四至五个月就安拆一次,但由于技术人员经验不足,管理不严,安装人员素质不高等原因,导致各种安全事故日益增多或造成塔机不能按正常施工工艺拆除,给生命和财产带来局大损失。根据多年的实践经验,总结出塔机在房屋建设过程中不同阶段应注意的问题供参考。
With the rapid progress of urbanization in our country, the construction industry has been rapidly developed, there are many housing construction projects, and the tower crane has been widely used in housing construction. As the tower crane is a special equipment, tower crane operation and management requires professional training of certified personnel, and the tower crane is a need to install and dismantle the construction site construction machinery, site transfer frequently, the general tower crane use no more than A year, ranging from four to five months on the demolition of a time, but due to lack of technical staff experience, lax management, the quality of the installer is not high, leading to an increasing number of accidents or caused by tower crane can not be disassembled according to the normal construction process, Great loss of life and property. Based on many years of practical experience, summarizes the tower crane in the housing construction process at different stages should pay attention to the problem for reference.