摘要:沥青混凝土路面在我国道路建设中使用非常广泛。它具有噪音低、粉尘少、易于维修、防水性能好等特点。沥青路面由于使用了粘结力较强的沥青材料,使矿料之间的粘结力大大加强,从而提高了混合料的强度和稳定性,使路面的质量和耐久性都得到提高。本文以沥青路面公路施工为研究对象,研究探讨了沥青路面公路施工技术,分析了沥青路面施工中需要着重考虑的要素。
关键词:沥青路面,施工技术,质量控制
Abstract: the asphalt concrete pavement in China are much used in road construction. It has a low noise and little dust, easy maintenance, waterproof properties is good wait for a characteristic. The asphalt pavement using the rapping strong asphalt material, make mineral aggregate bond between strengthened, and improve the mixture of strength and stability of road surface quality and durability are improved. Based on the highway asphalt pavement construction as the research object, and study explores the highway asphalt pavement construction technology, analyzes the asphalt pavement construction in the need to focus on the factors to consider.
Key words: the asphalt pavement, the construction technology and quality control
中图分类号:U416.217文献标识码:A 文章编号:
1 质量管理与控制
1.1对人的管理
生产过程中各工序和主要岗位(含管理人员)必须由有经验的人员或经过培训取得上岗资格的人员操作或管理。要有明确、严格的岗位责任制。要有严格的奖惩措施。要把每个人的切身利益与产品的质量紧密联系起来。使他们既有干好的技能。又有干好的愿望和动力。要经常对全体员工进行产品质量重要性的教育。特别是各级领导者必须牢固树立质量是企业生命的思想。
1.2原材料的管理与控制
对用于永久性工程的材料。应严格按有关规定和要求进行质量检验。把好原材料质量关。保证使用的原材料全部合格。对各种混合料的管理与控制。首先是抓配合比设计。使用于生产的配合比设计理想。然后是抓生产过程中的质量管理与控制。对沥青混合料来说。一是控制好油石比和矿料级配。二是控制好各个环节的温度。发现问题及时调整。這两个问题控制好了。质量就有保证。对半刚性基层、底基层混合料主要是控制好水泥、石灰等稳定材料的剂量。这是保证强度符合要求的主要因素,不得减料,必须用足;其次是生石灰消解要充分,过筛要严格,防止未消解的石灰块,否则将造成路面拱起;此外,含水量要适当,否则难以压实。
1.3对施工机械的管理
先进、良好的机械设备是保证质量、提高效率、加快进度与改善劳动条件的基础。机械管理主要是让各种路面施工机械处于良好状态、充分发挥其应有的作用。拌和厂和工地应有一个精干的机械维修小组并配备足够、适用的机具和易损零配件。一旦发生故障应能很快排除或修复。各类操作机手应持证上岗,严格按操作规程运行。漏油的机械、车辆不应上路,以避免给路面造成污染和损坏。
2 沥青砼表面层的施工
2.1沥青混合料的拌和
(1)高速公路沥青砼上面表层施工,其拌和站总量必须在160T/h以上,拌和站应具有自动记录功能。
(2)拌和厂必须配备合格的试验室和熟悉沥青混合料的试验、生产工艺、质量指标的试验人员,并能及时提供给监理工程师满意的试验资料。
(3)沥青加热温度及沥青砼的拌和温度、拌和时间、施工温度等应满足相关技术规范要求。
2.2沥青混合料的运输
(1)运输车辆必须是15T以上的自卸翻斗车,车况良好,车内必须清洁。
(2)装料时应前后移动,避免混合料离析。
(3)运送沥青混合料的汽车应覆盖,防止受到风吹、日晒、雨淋、污染等。运料汽车在摊铺机前10cm~30cm处停放,禁止碰撞摊铺机。
2.3沥青混合料的摊铺
摊铺机的摊铺工艺必须按摊铺机的操作规程进行。应缓慢、均匀、连续不间断地摊铺,提高摊铺平整度。当摊铺的混合料出现明显的离析、波浪、裂缝、疤痕时,应分析原因,予以消除。摊铺工艺要求如下。
(1)对于SMA或改性沥青混合料,宜使用履带式摊铺机铺筑。摊铺机的受料斗应涂刷薄层隔离剂或防粘结剂。
(2)对高速公路、一级公路,一台摊铺机的铺筑宽度,双车道不宜超过6m,三车道不宜超过7.5m。通常应采用两天以上相同序号的摊铺机前后错开10m~20m,保证两台摊铺机铺筑的混合料温度接近,不致影响热接缝的碾压效果,成梯队作业摊铺,相邻两幅之间应有3cm~6cm宽度的搭接,位置宜躲开车道的轮迹带,上下两层的搭接位置宜错开20cm以上。
(3)摊铺机必须在开始铺筑前提前0.5h~1h预热,加热温度视气温情况确定,气温低时应提高加热温度,通常宜加热至100℃以上。铺筑SMA及改性沥青混合料时,预热温度宜适当提高。每天施工开始阶段宜采用较高温度的混合料,使摊铺机温度尽快升高至正常情况。
2.4碾压施工中主要考虑要素
2.4.1碾压温度
碾压温度的高低直接影响沥青混合料的压实质量,混合料温度较高时,可以用较少的碾压遍数获得较高的密实度和较好的压实效果,但是混合料易被钢轮带起,产生明显的压痕和料推移现象,影响压实质量;温度较低时,碾压工作变得困难,容易产生很难此消除的轮迹,造成路面不平整,集料颗粒上沥青油膜的粘度较大,颗粒之间不易相对滑动,很难实现颗粒的重新排列,影响压实密实度和平整度。
2.4.2压实层的厚度
路基、路面底基层和基层的压实规律是:碾压层厚,不容易达到高的密实度,碾压层薄容易达到高的密实度。沥青面层的压实恰恰相反,碾压层厚比薄更容易达到高的密实度。其原因是薄层沥青混合料的温度降的很快,较低的温度明显降低压实效果。因此,在大多数国家对不同的沥青混合料都有最小厚度的推荐值,碾压层的厚度应该在推荐值之上才能获得较高的压实效果。
2.4.3压实速度和遍数
在碾压过程中,碾压速度和碾压遍数两参数互相制约,若碾压速度过快,则达到碾压质量所需的碾压遍数也增加,压实生产率并不能提高。因此合理的碾压速度,对减少碾压时间,提高作业效率是非常有意义的。一般速度控制在2~ 4km/h,轮胎压路机可适当提高,但不超过5km/h。速度过低,会使摊铺和压实工序间断,影响压实质量;速度过快,会产生推移、横向裂纹等路面缺陷。在我国碾压速度的选择原则是在保证沥青混合料碾压质量的前提下,最大限度的提高碾压速度,从而减少碾压遍数,提高工作效率。
2.5横缝处理
(1)横向接缝处理不好会严重影响面层平整度和行车舒适性,所以应认真对待。
(2)摊铺前,先用6米直尺检查,平整度超过3mm的部分应切去。接头处清理干净,再涂上粘层沥青,待基本干后摊铺机就位。
(3)熨平板开始预热后,测量原油面厚度,用虚铺系数计算出虚铺厚度,测量应准确。
(4)熨平板预热15-20min,使接缝处原路面温度达到65℃以上,再以2m/min的速度慢速摊铺。
(5)碾压用DD-110振动压路机进行,碾前将原路面上堆20cm宽混合料对原路面进行预热5-10min,然后将横向接缝碾压,每15cm间隔逐步错轮重叠压实两米宽度。
3 检测及缺陷处理
3.1检测贯穿于沥青混凝土路面施工的全过程,碾压成型后的路面必须满足设计要求。检测内容包括:测定平整度、厚度、宽度、高程及钻芯取样等工作。平整度的测定有两种办法,一种是用6m长铝合金尺杆(规范要求是3m直尺),另一种办法是车载连续平整度仪。两种办法都要用到,对局部可采用6m直尺,对比较长的范围可采用车载连续平整度仪。两种办法综合使用,可以准确的测定路面的平整度。
3.2常见沥青混凝土路面缺陷是多种多样的,从使用效果来看,主要表现在路面波浪、横缝跳车、密实度不够、局部推移、松散、隆起等,这些缺陷都是施工过程中造成的。路面波浪在施工过程中主要是由于摊铺机造成的,沥青混合料软弱或混合料温度组成的变化导致混合劲度的不均匀也是其中因素之一。
3.3资料的收集整理。沥青混凝土路面施工过程中各种材料的自检资料,质量评定资料都是非常重要的。要真实准确的记录每一个工作环节的详细数据,资料要归档存放,资料的种类包括各种检测试验表、照片、声像及原始记录。做好资料是竣工验收的关键依据。
4 结语
随着高等级公路的发展,各种路面新工艺凭借自身的优势将会大量推广,对其认知水平亟待提高。沥青混凝土路面施工的关键是人员、材料、设备的合理配置。在施工过程中要善于总结,克服不良人為因素,注重引进新技术、新材料、新工艺、新设备。对整个施工过程实施有效的动态管理,严格控制各种试验及检测。施工当中发现问题及时处理,只有加强管理,精心组织施工,才能铺筑出高质量、高水平的沥青混凝土路面,创造优良工程。
参考文献
[1] 沈金安,张登良.沥青及沥青混合料路用性能[M] .北京:人民交通出版社,2001.
[2] 张宗涛.沥青混合料级配优化的研究[J].长安大学,2000,6.
注:文章内所有公式及图表请以PDF形式查看。
关键词:沥青路面,施工技术,质量控制
Abstract: the asphalt concrete pavement in China are much used in road construction. It has a low noise and little dust, easy maintenance, waterproof properties is good wait for a characteristic. The asphalt pavement using the rapping strong asphalt material, make mineral aggregate bond between strengthened, and improve the mixture of strength and stability of road surface quality and durability are improved. Based on the highway asphalt pavement construction as the research object, and study explores the highway asphalt pavement construction technology, analyzes the asphalt pavement construction in the need to focus on the factors to consider.
Key words: the asphalt pavement, the construction technology and quality control
中图分类号:U416.217文献标识码:A 文章编号:
1 质量管理与控制
1.1对人的管理
生产过程中各工序和主要岗位(含管理人员)必须由有经验的人员或经过培训取得上岗资格的人员操作或管理。要有明确、严格的岗位责任制。要有严格的奖惩措施。要把每个人的切身利益与产品的质量紧密联系起来。使他们既有干好的技能。又有干好的愿望和动力。要经常对全体员工进行产品质量重要性的教育。特别是各级领导者必须牢固树立质量是企业生命的思想。
1.2原材料的管理与控制
对用于永久性工程的材料。应严格按有关规定和要求进行质量检验。把好原材料质量关。保证使用的原材料全部合格。对各种混合料的管理与控制。首先是抓配合比设计。使用于生产的配合比设计理想。然后是抓生产过程中的质量管理与控制。对沥青混合料来说。一是控制好油石比和矿料级配。二是控制好各个环节的温度。发现问题及时调整。這两个问题控制好了。质量就有保证。对半刚性基层、底基层混合料主要是控制好水泥、石灰等稳定材料的剂量。这是保证强度符合要求的主要因素,不得减料,必须用足;其次是生石灰消解要充分,过筛要严格,防止未消解的石灰块,否则将造成路面拱起;此外,含水量要适当,否则难以压实。
1.3对施工机械的管理
先进、良好的机械设备是保证质量、提高效率、加快进度与改善劳动条件的基础。机械管理主要是让各种路面施工机械处于良好状态、充分发挥其应有的作用。拌和厂和工地应有一个精干的机械维修小组并配备足够、适用的机具和易损零配件。一旦发生故障应能很快排除或修复。各类操作机手应持证上岗,严格按操作规程运行。漏油的机械、车辆不应上路,以避免给路面造成污染和损坏。
2 沥青砼表面层的施工
2.1沥青混合料的拌和
(1)高速公路沥青砼上面表层施工,其拌和站总量必须在160T/h以上,拌和站应具有自动记录功能。
(2)拌和厂必须配备合格的试验室和熟悉沥青混合料的试验、生产工艺、质量指标的试验人员,并能及时提供给监理工程师满意的试验资料。
(3)沥青加热温度及沥青砼的拌和温度、拌和时间、施工温度等应满足相关技术规范要求。
2.2沥青混合料的运输
(1)运输车辆必须是15T以上的自卸翻斗车,车况良好,车内必须清洁。
(2)装料时应前后移动,避免混合料离析。
(3)运送沥青混合料的汽车应覆盖,防止受到风吹、日晒、雨淋、污染等。运料汽车在摊铺机前10cm~30cm处停放,禁止碰撞摊铺机。
2.3沥青混合料的摊铺
摊铺机的摊铺工艺必须按摊铺机的操作规程进行。应缓慢、均匀、连续不间断地摊铺,提高摊铺平整度。当摊铺的混合料出现明显的离析、波浪、裂缝、疤痕时,应分析原因,予以消除。摊铺工艺要求如下。
(1)对于SMA或改性沥青混合料,宜使用履带式摊铺机铺筑。摊铺机的受料斗应涂刷薄层隔离剂或防粘结剂。
(2)对高速公路、一级公路,一台摊铺机的铺筑宽度,双车道不宜超过6m,三车道不宜超过7.5m。通常应采用两天以上相同序号的摊铺机前后错开10m~20m,保证两台摊铺机铺筑的混合料温度接近,不致影响热接缝的碾压效果,成梯队作业摊铺,相邻两幅之间应有3cm~6cm宽度的搭接,位置宜躲开车道的轮迹带,上下两层的搭接位置宜错开20cm以上。
(3)摊铺机必须在开始铺筑前提前0.5h~1h预热,加热温度视气温情况确定,气温低时应提高加热温度,通常宜加热至100℃以上。铺筑SMA及改性沥青混合料时,预热温度宜适当提高。每天施工开始阶段宜采用较高温度的混合料,使摊铺机温度尽快升高至正常情况。
2.4碾压施工中主要考虑要素
2.4.1碾压温度
碾压温度的高低直接影响沥青混合料的压实质量,混合料温度较高时,可以用较少的碾压遍数获得较高的密实度和较好的压实效果,但是混合料易被钢轮带起,产生明显的压痕和料推移现象,影响压实质量;温度较低时,碾压工作变得困难,容易产生很难此消除的轮迹,造成路面不平整,集料颗粒上沥青油膜的粘度较大,颗粒之间不易相对滑动,很难实现颗粒的重新排列,影响压实密实度和平整度。
2.4.2压实层的厚度
路基、路面底基层和基层的压实规律是:碾压层厚,不容易达到高的密实度,碾压层薄容易达到高的密实度。沥青面层的压实恰恰相反,碾压层厚比薄更容易达到高的密实度。其原因是薄层沥青混合料的温度降的很快,较低的温度明显降低压实效果。因此,在大多数国家对不同的沥青混合料都有最小厚度的推荐值,碾压层的厚度应该在推荐值之上才能获得较高的压实效果。
2.4.3压实速度和遍数
在碾压过程中,碾压速度和碾压遍数两参数互相制约,若碾压速度过快,则达到碾压质量所需的碾压遍数也增加,压实生产率并不能提高。因此合理的碾压速度,对减少碾压时间,提高作业效率是非常有意义的。一般速度控制在2~ 4km/h,轮胎压路机可适当提高,但不超过5km/h。速度过低,会使摊铺和压实工序间断,影响压实质量;速度过快,会产生推移、横向裂纹等路面缺陷。在我国碾压速度的选择原则是在保证沥青混合料碾压质量的前提下,最大限度的提高碾压速度,从而减少碾压遍数,提高工作效率。
2.5横缝处理
(1)横向接缝处理不好会严重影响面层平整度和行车舒适性,所以应认真对待。
(2)摊铺前,先用6米直尺检查,平整度超过3mm的部分应切去。接头处清理干净,再涂上粘层沥青,待基本干后摊铺机就位。
(3)熨平板开始预热后,测量原油面厚度,用虚铺系数计算出虚铺厚度,测量应准确。
(4)熨平板预热15-20min,使接缝处原路面温度达到65℃以上,再以2m/min的速度慢速摊铺。
(5)碾压用DD-110振动压路机进行,碾前将原路面上堆20cm宽混合料对原路面进行预热5-10min,然后将横向接缝碾压,每15cm间隔逐步错轮重叠压实两米宽度。
3 检测及缺陷处理
3.1检测贯穿于沥青混凝土路面施工的全过程,碾压成型后的路面必须满足设计要求。检测内容包括:测定平整度、厚度、宽度、高程及钻芯取样等工作。平整度的测定有两种办法,一种是用6m长铝合金尺杆(规范要求是3m直尺),另一种办法是车载连续平整度仪。两种办法都要用到,对局部可采用6m直尺,对比较长的范围可采用车载连续平整度仪。两种办法综合使用,可以准确的测定路面的平整度。
3.2常见沥青混凝土路面缺陷是多种多样的,从使用效果来看,主要表现在路面波浪、横缝跳车、密实度不够、局部推移、松散、隆起等,这些缺陷都是施工过程中造成的。路面波浪在施工过程中主要是由于摊铺机造成的,沥青混合料软弱或混合料温度组成的变化导致混合劲度的不均匀也是其中因素之一。
3.3资料的收集整理。沥青混凝土路面施工过程中各种材料的自检资料,质量评定资料都是非常重要的。要真实准确的记录每一个工作环节的详细数据,资料要归档存放,资料的种类包括各种检测试验表、照片、声像及原始记录。做好资料是竣工验收的关键依据。
4 结语
随着高等级公路的发展,各种路面新工艺凭借自身的优势将会大量推广,对其认知水平亟待提高。沥青混凝土路面施工的关键是人员、材料、设备的合理配置。在施工过程中要善于总结,克服不良人為因素,注重引进新技术、新材料、新工艺、新设备。对整个施工过程实施有效的动态管理,严格控制各种试验及检测。施工当中发现问题及时处理,只有加强管理,精心组织施工,才能铺筑出高质量、高水平的沥青混凝土路面,创造优良工程。