论文部分内容阅读
介绍东海大桥近岛段工程8×50m曲线顶推梁施工测量控制方法,分析曲线顶推梁线形控制的关键环节,为同类桥梁的施工提供一定的借鉴。
This paper introduces the measurement and control method of the 8 × 50m curve pushing girder in the near island section of Donghai Bridge and analyzes the key links in the linear control of the pushing girder of the curve, which will provide reference for the construction of similar bridges.