“一厂两调”模式下电网日发电计划在ePMS系统中流转

来源 :水电厂自动化 | 被引量 : 0次 | 上传用户:zbc518
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
发电厂根据电网每日下达的发电计划进行发电。目前绝大多数发电厂仅和一家电网公司签订发电协议。因此发电计划的下达和在发电厂企业信息系统中的流转相对简单。而长江电力下属的溪洛渡电厂由于地理位置的特殊性,导致其分别接受两大电网公司调度。因此需要在e PMS系统中将国家电网和南方电网下达的日发电计划进行整合流转,本文就“一厂两调”模式下的日发电计划如何在ePMS系统中流转做出设计,并对关键技术进行介绍。 Power plants generate electricity on the basis of a daily power grid plan. At present, most power plants only sign power generation agreements with a power grid company. Therefore, the issuance of power generation plans and the flow in the power plant enterprise information system are relatively simple. The Xiluodu Power Plant subordinated to Yangtze Power, due to the particularity of its geographical location, has caused it to separately accept the dispatch of two major power grid companies. Therefore, it is necessary to integrate the daily power generation plan issued by the State Grid and China Southern Power Grid in the e PMS system. In this paper, how to plan the daily power generation plan in the “one factory and two tunes” mode in the ePMS system, Key technologies are introduced.
其他文献